The purpose of the Architectural Review Board (ARB) is to regulate the external design, appearance, and maintenance of the properties and of improvements/modifications thereto in such a manner as to preserve and enhance property values and to maintain a harmonious relationship among structures and natural surrounds.

Architectural Review Guidelines

ARB Application

Architectural Review Process

INSTRUCTIONS:

Please read the guidelines and application requirements carefully before submitting an application. If you do not have the guidelines you may find these on our website or obtain a copy outside the management office.

Applications must be received in the office by 3:00pm on the 3rd Wednesday of the month.

ARB meetings are held on the 4th Wednesday of the month.

Applications received after the deadline will be held until the following meeting.

Proper completion of this application will expedite processing. Incomplete applications will be returned without approval.

The application MUST be accompanied by a copy of the survey (provided to each homeowner at the time of settlement) showing location and dimensions of proposed changes to scale.

All dimensions and any other information, which are necessary for clarity (materials, pictures, color, type of construction, drawing, etc.) must be included.

Township Approval is required for all construction. Prior ARB approval is necessary before submission to the Township. All outside improvements/changes require ARB approval and must have the necessary construction and zoning permits from Mt. Laurel Township.

Work must begin within six (6) months of approval and completed within ninety (90) days from the start of the project. If work is not started within six months, the approved application will be null and void.

Homeowners will be notified of the outcome of your request by postal mail. If you should have questions regarding the disposition, please contact the management office.